Client
Project
Metrage
Services
&CREW members
&CREW partners
Westvaer Notaries
Office Westvaer
1,900 m²
Strategic accommodation advice, selection of design and construction partners, project & cost management and implementation supervision for the complete interior design
Geert Wilmink, Rik Wisgerhof, Marloes van Duuren
Fokkema and Partners
Client
Westvaer Notaries
Project
Office Westvaer
Metrage
1,900 m²
Services
Strategic accommodation advice, selection of design and construction partners, project & cost management and implementation supervision for the complete interior design
&CREW members
Geert Wilmink, Rik Wisgerhof, Marloes van Duuren
&CREW partners
Fokkema and Partners
Project Description :
The task
Westvaer had the ambition to make its office environment future-proof and simultaneously create space for further growth. The existing accommodation offered insufficient possibilities for this, while within the same building, ‘FIRST Rotterdam’, opportunities lay to utilize space more smartly.&CREW was asked to guide Westvaer in this relocation process, looking not only at expansion but also at strategic choices, timing, and reuse.
Our role
&CREW fulfills a combined role within this project as strategic real estate advisor, project manager, and cost manager. In the preliminary phase, &CREW advised on the optimal real estate strategy, which ultimately led to a three-party solution within the building. This approach enabled Westvaer to gain accelerated access to the higher floors, 29 and 30, where Nauta was previously located. This made it possible to:
Expand Westvaer from floor 22 to floors 29 & 30
To speed up the planning
To best utilize existing furnishings.
In addition to strategic advice, &CREW provides overall project management and cost management. We focus on schedule, budget, and quality, and serve as the link between the client, design, and execution. The design of the new work environment is in the hands of Fokkema & Partners, with whom we collaborate intensively to create a high-quality, functional, and future-proof work environment.
Reuse as a starting point
Reuse is a key starting point for this project. The existing interior of the former Nauta floors was still of high quality. By critically assessing what is already present and smartly integrating it into the new design, a large part of the interior can be adopted. This approach requires substantive knowledge and sharp choices, but results in a sustainable and aesthetically strong working environment. By consciously choosing what already exists, an environment is created that fits Westvaer's identity and the spirit of the times.
A strong CREW
The Westvaer project shows what &CREW stands for: Strategic thinking, leading, and creating value through smart choices. By bringing together real estate strategy, reuse, and design, we are creating a future-proof working environment with maximum impact and minimum waste. Westvaer will occupy the new floors by the end of April 2026.
Direction, overview and content direction
In complex housing projects such as this one, direction is essential. Through our role as connecting link between strategy, design and realization, we ensure that choices fit together and the end result works for all users. This mix of pragmatism and total control ensures a great end result.
Want to know more about our approach? Be sure to get in touch.
