Together we make a difference for the Helen Dowling Institute

Client

Project

Metrage

Services

&CREW members

&CREW partners

Helen Dowling Institute

Helen Dowling Institute Bilthoven

1.700 m2

Strategic accommodation advice, selection and management of construction partners, project & cost management, implementation supervision

Bas Willems, Geert Wilmink

OTH

Bennink Climate Engineering

WeComplete B.V.

EN REAL ESTATE

Handzz

Client

Helen Dowling Institute

Project

Helen Dowling Institute Bilthoven

Metrage

1.700 m2

Services

Strategic accommodation advice, selection and management of construction partners, project & cost management, implementation supervision

&CREW members

Bas Willems, Geert Wilmink

&CREW partners

OTH

Bennink Climate Engineering

WeComplete B.V.

EN REAL ESTATE

Handzz

Project Description :

The task:

The headquarters and home of the Helen Dowling Institute is idyllically located in the woods of Bilthoven, a beautiful building in an equally beautiful location. On the inside, fantastic care is provided by the professionals of the HDI, however, the comfort of the building left much to be desired. After years of intensive use, it was time to upgrade and make the climate systems more sustainable. This takes place in two phases, in connection with the financing, but also to minimize the impact on the necessary care. This requires different project management than usual.

 

If you would like to make another contribution, you can! See for this https://www.linkedin.com/feed/update/urn:li:activity:7336345146537500673

 

Our role:

For years our partners have been ambassadors of the Helen Dowling Institute, so it was also a logical step to take up the gauntlet in early 2025 to contract the various parties for the realization of this special project. After making a cost estimate, selecting the parties and going through the approval process, the realization of Phase 1 started in the second quarter of 2025.

 

Scope:

In Phase 1, all central air conditioning systems in the technical space are replaced or upgraded, in addition, the entire 1e floor with a new, sustainable, comfortable climate control system, issues surrounding acoustics and fire safety were resolved and acoustics improved. In early July, this part of the project was completed and, after a major cleaning, all the furniture was put back in place and care services resumed unhindered. To make this possible, many of HDI's activities were temporarily diverted to alternative locations, or to online collaboration. Fortunately, due to the phasing, a large part of the important care activities could continue on the first floor, which remained open as usual. For our building partners, it was natural to respond to this and be flexible. An early start, no Dutch hits blaring across the building site, but a cup of coffee together and a helping hand characterized the mentality.

 

Phase 2 is currently under preparation, this phase includes the realization and replacement of the air conditioning systems on the first floor and improving the acoustics in the atrium and reception areas.

 

A strong CREW

The cooperation with the Helen Dowling staff, partners WeComplete and Bennink Klimaattechniek really make a difference here. Understanding, calmness and a warm heart for the work of the HDI make all the difference. For our team, it is very rewarding and beautiful work. This is what makes working with and at &CREW so wonderful. From the Zuidas, to Portugal, but certainly also in the forests of Bilthoven, we realize meaningful projects.