Client
Project
Metrage
Services
&CREW members
&CREW partners
Ballast Nedam NV
Utrecht headquarters
5.000 m2
Workplace Consultancy, design coordination, cost management, overall project management & steering airframe/cascade/ fit-out
Geert Wilmink, Sietske Baarsma, Lars Doevelaar, Leendert Trouwborst, Rik Wisgerhof, Marloes van Duuren
OTH Architects
Studio Rublek
Client
Ballast Nedam NV
Project
Utrecht headquarters
Metrage
5.000 m2
Services
Workplace Consultancy, design coordination, cost management, overall project management & steering airframe/cascade/ fit-out
&CREW members
Geert Wilmink, Sietske Baarsma, Lars Doevelaar, Leendert Trouwborst, Rik Wisgerhof, Marloes van Duuren
&CREW partners
OTH Architects
Studio Rublek
Project Description :
The task
Together with Ballast Nedam and OTH Architects, &CREW is realizing the new headquarters on Euclideslaan in Utrecht. A future-proof working environment in which collaboration, meeting and sustainability are central themes. The existing 5,000 m² building is therefore undergoing a major renovation to bring it fully in line with the needs of the organization and the new way of working that Ballast Nedam wants to embrace. In early 2024, &CREW was asked to investigate the feasibility and fit-in of this location. At that time, the property had not yet been purchased. Together with OTH Architects, &CREW updated the Spatial Program of Requirements (RPvE) and tested it against current ambitions. After a detailed building analysis and the preparation of test-fits, it appeared that the program was an excellent fit within the property, after which Ballast Nedam proceeded to purchase in September 2024.
Our role
&CREW provides integral project management of the renovation and interior design. From the preparation of the project plan, budget and planning to the management of casco/ casco+ works together with Ballast Nedam itself. In addition, &CREW is responsible for:
Realization began in March 2025 with the dismantling work and securing of the floors. Meanwhile, the office floors (floors 3 to 6) have been largely completed with new climate systems, lighting, ceilings and floor finishes. On the first floor, the new facade was recently installed by Heddes Bouw, making the renewed entrance and spatial character clearly visible.
The work environment
The new office is designed from an activity-related workplace concept, which focuses on collaboration, meeting and flexibility. The ground and second floors form the social heart of the building with spaces for meeting, conference, co-working and a new company restaurant. The office floors (3 to 6) are arranged around a central pantry as a meeting place, from which open and closed work zones alternate for rest, focus and cooperation. Outside, attention has also been paid to experience and sustainability: the parking deck will be adapted for greener living spaces and the possibility of charging electric cars with solar energy.
A strong CREW
The project on Euclideslaan demonstrates what characterizes &CREW: substantive direction, overview and partnership. Whereas casco and fit-out are normally two separate processes, here they are interwoven to meet the schedule, a choice that demands trust and craftsmanship. Together with Ballast Nedam, OTH Architects and all partners involved, &CREW is working on a future-proof and inspiring head office, ready for the next phase in Ballast Nedam's growth.
This special transformation and the collaboration between Ballast Nedam, OTH Architects, and &CREW are highlighted extensively in the trade magazine Urban planning. The publication underscores how a challenging project, combined with parallel processes and a shared ambition, leads to an inspiring work environment and a strong final result: Urban Development Publication Ballast Nedam CREW